📖 Geotechnical Instrumentation & ADAS Glossary¶
Comprehensive technical glossary and reference dictionary covering subsurface geotechnical instrumentation, sensor physics, automated data acquisition systems (ADAS/ADAQS), wireless telemetry, and field monitoring engineering. Grounded in international standards (ISO 18674, ASTM, BS 5930) and John Dunnicliff's foundational principles.
1. Subsurface Sensors & Measurement Devices¶
Piezometers & Pore Water Pressure¶
- Piezometer: An instrument installed in soil, rock, or backfill to measure pore water pressure or groundwater elevation.
- Vibrating Wire Piezometer (VWP): A diaphragm-based sensor where water pressure deflects a flexible diaphragm connected to a tensioned steel wire. Changes in diaphragm deflection alter wire tension and its natural resonant frequency (\(f\)). Highly resistant to electrical noise and long cable runs.
- Standpipe Piezometer (Casagrande): An open-tube piezometer consisting of a porous ceramic or plastic tip connected to a riser pipe. Measures hydrostatic water level directly using an electric water level indicator (dip meter). Slower hydraulic response time in low-permeability clays.
- Pneumatic Piezometer: A diaphragm sensor operated by gas pressure. Gas (usually nitrogen) is pumped down a supply tube until it balances pore pressure and opens a valve, venting through a return tube. Zero fluid volume change, negligible time lag.
- Drive-In / Push-In Piezometer: A robust, pointed-tip piezometer pressed directly into soft clay or silt formations without pre-drilling a borehole.
- High-Air-Entry (HAE) vs Low-Air-Entry (LAE) Filter:
- HAE Ceramic: Fine pore size (typically 1–2 µm) with high bubbling pressure, preventing air entry under negative pore water pressures (suction) in unsaturated soils.
- LAE Carborundum/Polyethylene: Coarse pore size (typically 50 µm), designed for rapid saturation in standard saturated groundwater measurements.
- Multi-Level Piezometer Array: Multiple VWP sensors positioned at discrete elevations within a single borehole to capture vertical hydraulic gradients, perched aquifers, and seepage profiles.
Inclinometers & Lateral Displacement¶
- Inclinometer Casing: Special grooved plastic (ABS) or aluminum tubing installed in a borehole, slurry wall, or embankment, with internal orthogonal keyways that guide probe orientation.
- Traversing Probe Inclinometer: A wheeled torpedo containing dual orthogonal servo-accelerometers or MEMS sensors, lowered into grooved casing on a graduated control cable to record tilt profiles at regular intervals (e.g., 0.5 m).
- In-Place Inclinometer (IPI): A string of articulated tilt sensor pods permanently suspended inside grooved casing at critical depths to provide continuous, automated lateral displacement logging.
- ShapeArray (SAA / Flexible 3D Array): A jointed string of miniature rigid segments interconnected by flexible joints, containing triaxial MEMS accelerometers that measure continuous 3D displacement profiles in real time.
- Horizontal Inclinometer: An inclinometer system utilizing horizontally installed grooved casing to measure vertical settlement and heave profiles beneath embankments, tanks, or landfills.
- Spiral Twist Survey: An auxiliary probe run used to measure rotational twist in inclinometer casing keyways over deep boreholes, correcting azimuth errors in lateral deflection calculations.
Extensometers & Settlement Systems¶
- Multipoint Borehole Extensometer (MPBX): An assembly of anchors fixed at varying depths inside a borehole, linked via rigid rods or fiberglass tendons inside protective sleeves to a reference head at the surface. Measures axial ground movement and zone deformation.
- Magnetic Settlement Gauge: An access pipe surrounded by external spider magnets anchored to the soil. A portable reed-switch probe lowered down the pipe sounds a buzzer when passing each magnetic target, yielding point-specific vertical settlement.
- Liquid Level Settlement Cell: A differential pressure sensor or overflow cell linked via liquid-filled tubing to an external reservoir, measuring vertical elevation changes of subterranean structures or foundation slabs.
- Settlement Plate: A rigid steel or timber plate placed on original ground prior to fill placement, connected to a vertical riser pipe extended as embankment height increases.
- Tape Extensometer: A portable high-precision steel measuring tape with an in-line micrometer tensioning head, used to measure convergence across tunnel walls and excavation struts.
Structural & Load Monitoring¶
- Load Cell (Center-Hole / Annular): An instrument placed beneath anchor nuts on tiebacks, rock bolts, or foundation struts to measure axial tensile or compressive load. Most commonly utilizes multiple vibrating wire strain gauges arranged in parallel.
- Vibrating Wire Strain Gauge (VWSG): A sensor welded to steel structures or embedded directly in concrete (sister bar / embedment gauge) to record micro-strain (\(\mu\varepsilon\)) caused by structural loading or thermal expansion.
- Earth Pressure Cell (Total Pressure Cell): Two circular or rectangular steel plates welded together with an incompressible hydraulic fluid between them, connected to a pressure transducer. Installed at the soil-structure interface or within embankment fill.
- Tiltmeter: An instrument anchored to retaining walls, historic structures, or bridge piers to detect angular rotation. Utilizes electrolytic bubbles or high-precision MEMS sensors.
- Crackmeter / Jointmeter: A displacement transducer anchored across concrete joints or rock fissures to monitor relative joint opening, closing, and shear movements.
2. Automated Data Acquisition Systems (ADAS) & Telemetry¶
Signal Conditioning & Protocols¶
- ADAS / ADAQS: Automated Data Acquisition System — an autonomous setup comprising sensors, data loggers, power modules, and communications infrastructure for unattended geotechnical monitoring.
- Pluck Frequency Excitation: The standard method for vibrating wire sensors, in which an electromagnetic coil applies a rapid swept-frequency impulse to pluck the steel wire into mechanical resonance, followed by reading the induced sinusoidal signal.
- Spectral Analysis / VSPECT: Advanced signal conditioning technology that performs Fast Fourier Transforms (FFT) on the raw vibrating wire return signal, isolating the true fundamental resonant frequency from external electrical noise.
- 4–20 mA Current Loop: An analog transmission standard where sensor signals are modulated as electric current. Highly immune to cable resistance over long distances.
- RS-485 / Modbus RTU: A balanced differential serial bus standard capable of multidrop networking up to 32+ digital sensors over distances up to 1,200 meters.
- SDI-12: A low-power, serial digital interface standard widely used in environmental and geotechnical sensors operating at 1200 baud.
- CAN Bus / CANopen: A robust vehicle-grade digital bus protocol adopted in high-speed and underground tunneling instrumentation.
Wireless Networks & Field Hardware¶
- Data Logger: An electronic instrument that powers attached sensors, digitizes analog signals, processes calibration polynomials, and stores timestamped records in non-volatile flash memory.
- Relay Multiplexer: An expansion module utilizing solid-state or sealed reed relays to sequentially switch multiple sensor channels into a single data logger measurement port.
- LoRaWAN (Long Range Wide Area Network): Low-power, long-range wireless protocol operating on unlicensed sub-GHz bands (868 MHz EU, 915 MHz US/Americas, 923 MHz AS). Excellent penetration in dense urban environments and deep pits.
- Wireless Mesh Network: A self-forming, self-healing network topology where sensor nodes act as relays to route data packets to a central gateway, providing operational resilience against line-of-sight obstructions.
- Cellular IoT (NB-IoT & LTE-M): Low-power cellular communication standards built for battery-operated IoT sensors, transmitting small data packets directly to cloud servers via commercial telecom towers.
- Satellite Telemetry (Iridium SBD): Low-earth-orbit satellite data transmission used for mission-critical remote dams and mining sites where terrestrial cellular networks do not reach.
- Solar Power Module & MPPT: Photovoltaic solar array combined with a Maximum Power Point Tracking (MPPT) charge controller and sealed AGM or LiFePO4 battery for autonomous field operation.
3. Sensor Physics & Mathematical Reductions¶
Vibrating Wire Reductions¶
-
Natural Frequency Equation: The fundamental resonant frequency \(f\) of a clamped wire under tension \(\sigma\):
\[ f = \frac{1}{2L} \sqrt{\frac{\sigma}{\rho}} = \frac{1}{2L} \sqrt{\frac{E \cdot \varepsilon}{\rho}} \]Where \(L\) is wire length, \(\rho\) is density, \(E\) is Young's modulus, and \(\varepsilon\) is wire strain.
-
Digits (Linear Period Units): A linearizing parameter directly proportional to wire strain:
\[ \text{Digits} = \frac{f^2}{1000} \] -
Linear Calibration Equation:
\[ P = G \cdot (R_0 - R) \]Where \(G\) is the gauge factor (calibrated linear coefficient), \(R_0\) is baseline reading in digits, and \(R\) is current reading.
-
Polynomial Calibration Equation (Second-Order):
\[ P = A \cdot R^2 + B \cdot R + C \]Provides higher measurement precision over broad pressure ranges.
-
Thermal Compensation (\(K_T\)):
\[ P_{corr} = P_{raw} + K_T \cdot (T - T_0) \]Corrects for differential thermal expansion between the vibrating wire and the stainless steel sensor body.
-
Barometric Compensation:
\[ P_{net} = P_{measured} - (B - B_0) \]Essential for sealed piezometers to isolate genuine groundwater changes from ambient atmospheric barometric swings.
Inclinometer Data Reduction¶
-
Deflection Increment (\(\delta_i\)):
\[ \delta_i = L \cdot \sin(\theta_i) = C \cdot (A_0 - A_{180}) \]Where \(L\) is probe wheelbase (typically 500 mm), \(\theta_i\) is tilt angle, and \(A_0, A_{180}\) are conjugate runs.
-
Check Sum (Zero Offset Error):
\[ \text{Check Sum} = A_0 + A_{180} \]A constant value across all depths confirming instrument stability and absence of mechanical contamination in wheels.
-
Cumulative Displacement (\(D_k\)):
\[ D_k = \sum_{i=1}^k \delta_i \]Summation of incremental displacements calculated from the stable bottom anchor upwards to the surface collar.
4. Engineering Risk & TARP Frameworks¶
- TARP (Trigger Action Response Plan): A systematic emergency and risk management framework that establishes defined operational actions based on observed instrumentation thresholds:
- Level 0 (Green / Baseline): Normal behavior within predicted design limits. Standard monitoring frequency.
- Level 1 (Amber / Alert): Measurement exceeds statistical baseline or initial safety margin. Monitoring frequency doubled; engineering site inspection dispatched.
- Level 2 (Orange / Review): Significant trend acceleration or structural stress approaching design tolerance. Senior engineering review, verification of backup instruments, equipment standby.
- Level 3 (Red / Action Required): Critical threshold breached; imminent structural failure or uncontrollable seepage. Immediate work stoppage, site evacuation, and execution of emergency remedial protocols.
- Velocity of Displacement (\(v = \frac{d\delta}{dt}\)): Rate of ground movement over time. An acceleration in displacement velocity is the primary precursor to catastrophic slope and excavation failures.
- Phreatic Line (Seepage Line): The upper boundary of water seepage flow through an earth dam embankment, at which pore water pressure equals atmospheric pressure.
- Piping (Internal Erosion): Progressive removal of soil particles by seepage flow through embankment dams or foundations, leading to internal conduits and dam breaching.
5. Field Installation & Grouting Best Practices¶
- Fully Grouted Method (Mikkelsen / Contreras): Installation technique where piezometers are placed directly into a borehole and encapsulated completely in a cement-bentonite grout without a traditional sand filter pack or bentonite pellets. Enabled by the extremely low volume displacement of modern diaphragm sensors.
- Grout Mix Proportions: Specific ratio of water to Portland cement and sodium bentonite powder designed to match the permeability and modulus of the surrounding ground formation:
- Soft soil: Water:Cement:Bentonite \(\approx\) 2.5 : 1.0 : 0.3 to 0.4 by weight.
- Medium to stiff rock: Water:Cement:Bentonite \(\approx\) 1.5 : 1.0 : 0.1 by weight.
- Bentonite Pellet Seal: Highly compressed sodium bentonite tablets tamped above sand packs in traditional Casagrande installations, swelling upon hydration to form an impermeable hydraulic seal.
- Telescoping Coupling: Slip-joints placed along inclinometer or settlement casing strings to prevent axial compression and buckling when large vertical settlements occur.
6. Tailings Storage Facilities & Tailings Dam Safety¶
- Tailings: The finely ground waste solids left after extracting metals or minerals from ore, transported and deposited as a slurry.
- Tailings Storage Facility (TSF): The complete impoundment system — embankment(s), deposited tailings, supernatant pond, decant, and reclaim works — that stores mine tailings.
- Tailings Dam: The engineered embankment that retains the tailings deposit; often raised incrementally over the mine life and frequently built from the tailings themselves.
- Embankment Raise (Dam Raise): An incremental addition to the height of a tailings embankment, placed by the upstream, centerline, or downstream method.
- Downstream Construction Method: Each raise is placed downstream of the previous one, so most of the structure rests on foundation — generally the most robust method.
- Centerline Construction Method: Raises are placed on the original centerline; intermediate in risk.
- Upstream Construction Method: Each raise is placed on the upstream (deposited) side, so the embankment rests on loose, saturated tailings — the highest-risk method, prone to liquefaction.
- Beach (Tailings Beach): The gently sloping surface of deposited tailings between the discharge point and the supernatant pond.
- Beach Geometry: The slope and length of the beach, which control where the phreatic surface sits and how much freeboard is retained.
- Supernatant Pond: The body of clarified water above the settled tailings, from which water is recovered or decanted.
- Decant (Decant Tower / Decant System): The structure and piping used to remove supernatant water and control pond level and freeboard.
- Freeboard: The vertical distance between the pond surface and the lowest point of the embankment crest; a primary safeguard against overtopping.
- Spigotting / Deposition: Discharging the tailings slurry from the embankment crest to build the beach by hydraulic deposition.
- Thickened / Paste / Filtered Tailings: Dewatered tailings (progressively higher solids content) that reduce free water and lower liquefaction risk.
- In-Pit / Paddock Storage: Storing tailings in a mined-out pit or a ring-dyke paddock instead of a valley impoundment.
- Liquefaction: Loss of shear strength when a saturated, loose (contractive) soil is loaded or shaken and pore pressure rises toward near-zero effective stress.
- Static Liquefaction: Liquefaction triggered by a static load (a raise, rapid pond rise, or foundation weakness) rather than an earthquake — the dominant catastrophic mechanism in tailings failures.
- Seismic Liquefaction: Liquefaction triggered by cyclic earthquake shaking.
- Pore-Pressure Ratio (\(r_u\)): The ratio of measured pore pressure to the initial vertical effective stress (\(r_u = u / \sigma'_v\)); rising values signal approaching liquefaction.
- Excess Pore Pressure: Pore pressure above the steady-state (hydrostatic) value, generated by loading, construction, or shaking.
- Flow Failure / Run-out: A liquefied mass that flows rapidly and travels long distances, causing extreme downstream damage.
- Toe Drain: A permeable zone or drain at the downstream toe that collects and controls seepage, keeping the phreatic surface low.
- Turbid Seepage: Seepage carrying fine soil particles (cloudy discharge) — a warning sign of internal erosion (piping).
- Consequence Category: A classification of a facility by the potential downstream impact of failure (often A/B/C), which sets the intensity of monitoring and review.
- Closure (Mine Closure): The post-operational phase in which the facility is decommissioned and made safe, requiring continued surveillance until the long-term steady state is demonstrated.
- InSAR / A-DInSAR (Satellite Radar Interferometry): A remote-sensing technique using repeat satellite radar passes to measure millimetre-scale ground displacement over a whole facility with no on-site instruments.
7. Dam Performance Monitoring (ASCE MOP-135 scope)¶
- Dam Performance: The observed behavior of a dam, its foundation, and appurtenant structures compared with expected behavior.
- Expected vs. Measured Behavior: The comparison at the heart of monitoring; a large, unexplained, or trending difference is an anomaly.
- Performance Signal: The difference between measured and expected behavior used to judge whether the dam is performing acceptably.
- Potential Failure Mode: A credible way in which a dam could fail (e.g., overtopping, internal erosion, slope instability, foundation seepage); the basis for choosing instruments.
- Uplift: Upward water pressure acting on the base of a concrete dam or within a foundation, reducing stability.
- Appurtenant Structures: Auxiliary works such as spillways, outlet works, and decants that support the main dam.
- Crest Settlement / Displacement: Vertical or horizontal movement of the dam crest, a key deformation indicator.
- Surveillance Plan: The documented program stating what is monitored (visually and by instrument), how often, and the response to each anomaly.
- Independent Review: Periodic review of monitoring data and the program by a party independent of the operating team, to catch normalized trends.
8. Monitoring Program Planning & Reliability (Dunnicliff)¶
- Geotechnical Instrumentation: The measurement of soil, rock, foundation, and structural behavior to confirm performance and detect change.
- Systematic Planning Approach: Dunnicliff's structured process (the "hub") that defines the geotechnical questions first, then selects parameters, instruments, locations, and frequency.
- Geotechnical Question: A specific question the monitoring must answer (e.g., "will the wall exceed allowable movement?"), which dictates what is measured and the decision supported.
- The Chain of 25 Links: Dunnicliff's metaphor that monitoring success is a chain from defining the project need to a reading that informs a decision; break any link and the chain fails.
- Recipe for Reliability: The set of ingredients (selection, procurement, installation, calibration, reading, maintenance, data handling, people) that make monitoring trustworthy.
- Observational Method: A design approach in which the design is refined during construction based on monitored performance.
- Transducer: A device that converts a physical quantity (pressure, displacement, load) into an electrical or pneumatic signal.
- Accuracy vs. Precision: Accuracy is closeness to the true value; precision (repeatability) is closeness of repeated readings to each other. Neither alone guarantees a good measurement.
- Hysteresis: The dependence of an instrument's output on the direction of change (loading vs. unloading).
- Error Budget: The combined effect of all individual uncertainties (sensor, cable, readout, environment) that bounds the total measurement uncertainty.
- Calibration Factor / Zero / Span: The slope of the input–output relationship (calibration factor), the reading at zero input, and the full-scale range (span).
- Baseline Reading: The reference reading(s) taken after installation and settlement, against which all future change is judged.
- Piezometric Head: The equivalent water-surface elevation corresponding to a measured pore pressure.
- Hydraulic Time Lag: The delay of a piezometer's response to a change in pore pressure, governed by the permeability and geometry of the surrounding ground and filter.
- Saturation / De-airing: The procedure of removing air from a piezometer's filter and connecting tube so it responds correctly to pore pressure; a critical, often-neglected installation step.
- Convergence: The shortening (closure) of the distance between points in a tunnel or excavation, indicating ground movement.
- Telltale: A simple device that indicates relative movement across a joint or section.
- Sister Bar: A vibrating-wire strain gauge attached parallel to a rebar so that it measures the rebar's strain when embedded in concrete.
- Overcoring: A stress-relief technique in which a borehole instrument is isolated by overcoring to back-calculate the in-situ rock stress state.
- Flat Jack: A thin hydraulic jack inserted in a slot in rock to measure stress relief and estimate in-situ stress.
- Borehole Pressure Cell (BPC): A device grouted into a borehole to monitor changes in rock stress around an opening.
- Contact Stress Cell: A pressure cell placed flush against a soil–structure interface to measure contact stress.
9. FHWA Highway Instrumentation (FHWA-HI-98-034 scope)¶
- Golden Rule (instrumentation): Every instrument must be selected and placed to answer a specific geotechnical question — if there is no question, there should be no instrumentation.
- Chain of 31 Links: The 21 planning links plus 10 execution links that must all hold for a monitoring program to succeed; one weak link can break it.
- Embedment Earth Pressure Cell: A flat, fluid-filled cell embedded in soil to measure the total stress normal to its face.
- Aspect Ratio (cell): The diameter-to-thickness ratio of an earth pressure cell; a high ratio reduces measurement error.
- Soil/Cell Stiffness Ratio: The ratio that governs how much an earth pressure cell redistributes local stress, and thus its measurement error.
- Observation Well: An open pipe with no subsurface seal; it creates a vertical connection between strata and is rarely suitable for performance monitoring.
- Open Standpipe (Casagrande) Piezometer: A filter-tipped riser pipe; reliable but with a long hydrodynamic time lag.
- Pneumatic Piezometer: A diaphragm balanced by gas pressure through twin tubes; short lag, no freezing, but operator-dependent.
- Vibrating-Wire (VW) Piezometer: A stiff-diaphragm instrument read by the change in wire frequency; short lag and datalogger-ready.
- Multipoint Piezometer: A single borehole containing several sensors to profile pressure with depth.
- Settlement Platform: A surface plate (often with a riser) recording fill settlement as an embankment is built.
- Subsurface Settlement Point: An anchor at depth (driven/grouted or Borros) recording settlement of a buried layer.
- Liquid-Level Gage: A liquid-filled tube and cell that measures settlement or heave from the change in pressure or liquid level.
- Series Extensometer: A stack of anchors in one borehole that resolves deformation into increments between adjacent anchors.
- Horizontal Inclinometer: An inclinometer traversing a horizontal casing to give a settlement profile.
- In-Place (Fixed) Inclinometer: A string of sensors left in casing for continuous, automated monitoring.
- Shear-Plane Indicator: A device that detects the depth at which inclinometer casing shears.
- Acoustic Emission (AE) Monitoring: Detecting the high-frequency sound from grain slip and breakage as early warning of developing instability.
- Demec Gage: A mechanical surface strain gage measuring the change in distance between two reference discs.
- Calibrated Hydraulic Jack: A center-hole jack used to apply and measure load in tensioning; it must be calibrated because fluid-pressure readings carry friction error.
- Contact Earth Pressure Cell: A cell measuring stress or load at a soil–structure interface, at a pile toe, or at a shaft base.
- Load Transfer (deep foundations): The distribution of axial load between shaft friction and end bearing, resolved from strain gages, sister bars, and telltales.
- Ground Improvement: In-situ modification of ground properties — by grouting, densification, or drainage — to make it suitable for construction.
- Acceptance Test (pre-/post-installation): A test confirming an instrument meets specification before installation and survived installation afterwards.
- Installation Record Sheet: The as-built record of position, depth, seal, and the calibration values in force — the permanent record that makes data interpretable.
- Cause-and-Effect Plot: A plot of measured change against an influencing factor (load, rainfall, fill height) to reveal relationships.
- Implementation (final link): Acting on the interpreted data — the step that makes monitoring worthwhile.
10. Foundation Engineering & Soil Mechanics (USACE / FHWA public-domain scope)¶
- Effective Stress (\(\sigma'\)): The stress carried by the soil skeleton — total stress minus pore-water pressure; the stress that actually controls strength and deformation.
- Pore-Water Pressure (\(u\)): The pressure of water in the voids; positive below the water table and negative (suction) above it.
- Total Stress (\(\sigma\)): The stress carried by the soil skeleton and the pore water together; \(\sigma = \sigma' + u\).
- Void Ratio (\(e\)): The volume of voids per unit volume of solids.
- Porosity (\(n\)): The volume of voids per unit total volume.
- Degree of Saturation (\(S\)): The fraction of the void volume filled with water.
- Atterberg Limits (\(LL\), \(PL\), \(SL\)): The water contents marking the transitions between the solid, plastic, and liquid states of a fine-grained soil.
- Plasticity Index (\(PI\)): The range of water content over which a soil is plastic; \(PI = LL - PL\).
- USCS (Unified Soil Classification System): The two-letter engineering classification of soils (e.g. CL, SP, GW) based on gradation and plasticity.
- Compaction Curve: The plot of dry unit weight against water content; its peak defines the optimum water content.
- Optimum Water Content (OMC): The water content at which a given compactive effort produces the maximum dry unit weight.
- Proctor Test (Standard / Modified): The laboratory compaction test that defines the moisture–density relationship used for field control.
- Darcy's Law: The linear relation between seepage velocity and hydraulic gradient, \(v = ki\).
- Coefficient of Permeability (\(k\)): The constant linking flow velocity to hydraulic gradient for a given soil.
- Flow Net: A graphical solution of Laplace's equation, drawn as orthogonal flow lines and equipotential lines.
- Exit Gradient: The hydraulic gradient at the downstream surface; if it exceeds the critical value, piping begins.
- Quick Condition / Piping: The state in which upward seepage reduces effective stress to zero and the soil boils.
- Consolidation: The time-dependent compression of a saturated soil as pore water drains and effective stress rises.
- Coefficient of Consolidation (\(c_v\)): The parameter governing the rate of primary consolidation.
- Compression Index (\(C_c\)): The slope of the virgin portion of the \(e\)–\(\log\sigma'\) curve.
- Preconsolidation Pressure (\(\sigma'_p\)): The maximum effective stress a soil has ever sustained.
- Overconsolidation Ratio (\(OCR\)): The preconsolidation pressure divided by the present effective stress; \(OCR = 1\) is normally consolidated.
- Mohr–Coulomb Criterion: Failure when the shear stress reaches \(\tau = c' + \sigma'\tan\phi'\).
- Cohesion (\(c'\)): The shear-strength intercept of the failure envelope at zero effective normal stress.
- Angle of Internal Friction (\(\phi'\)): The slope of the Mohr–Coulomb envelope, reflecting interparticle friction and interlocking.
- Undrained Shear Strength (\(c_u\) / \(s_u\)): The shear strength of a saturated clay measured without drainage.
- Bearing Capacity (\(q_{ult}\)): The maximum pressure a foundation soil can carry before shear failure.
- Allowable Bearing Pressure (\(q_{all}\)): The design pressure obtained after applying a factor of safety and settlement limits.
- Settlement: The vertical downward movement of a foundation under load.
- Differential Settlement: The difference in settlement between points of a structure; it governs distortion and damage.
- Skin Friction: The shear resistance developed along the shaft of a pile or drilled shaft.
- End Bearing: The resistance mobilised at the base of a deep foundation.
- Negative Skin Friction (Downdrag): Down-drag on a pile when the surrounding soil settles relative to the pile.
- Pile Group Efficiency: The ratio of the capacity of a pile group to the sum of the single-pile capacities.
- Lateral Earth Pressure (At-Rest / Active / Passive): The horizontal stress a soil exerts on a retaining structure — least when the wall yields (active) and greatest when the wall is pushed into the soil (passive).
- Coefficient of Lateral Earth Pressure (\(K_0\), \(K_a\), \(K_p\)): The ratio of horizontal to vertical effective stress in the at-rest, active, and passive states.
- Factor of Safety (slope): The ratio of available shear strength to the shear stress required for equilibrium.
- Standard Penetration Test (\(SPT\), \(N\)-value): A driven split-spoon test whose blow count indexes soil density and strength.
- Cone Penetration Test (\(CPT\)): A pushed cone giving continuous tip resistance and sleeve friction with depth.
- Liquefaction: Loss of strength in saturated loose sand under cyclic loading when pore pressure approaches the total stress.
- Expansive Soil: Clay that swells on wetting and shrinks on drying, causing heave and cracking.
- Collapsible Soil: Soil that undergoes sudden volume reduction on wetting at constant load.
See also: Thuật ngữ Anh – Việt (Vietnamese Glossary) · Compliance Matrix (Decree 114 / TCVN 9398) · Interactive Sandbox